Offshore Marine and Shipbuilding

Owner:

Swiber

Project:

Full Detail Design of Submersible Float – Over and Launch Barge

Shipyard:

BKM Group (Batam, Indonesia) & Nexus Shipyard (Batam, Indonesia)

Key Project Figures:

  • Main particulars : 160x40x12m
  • Float-over for topsides up to 18.000 t
  • Launch for Jacket up to 20.000 t
  • Dead weight capacity : 25.000 t
  • Submersible : 24m

Work Scope:

  • Design and Engineering
  • Ship Design & Marine
  • Project Management/ Assistance
    • Suppliers & Yards Follow-up assistance

Owner:

Swiber

Project:

Full Detail Design of Submersible Float –Over and Launch Barge

Shipyard:

BKM Group (Batam, Indonesia) & Nexus Shipyard (Batam, Indonesia)

Key Project Figures:

  • Main particulars : 160x40x12m
  • Float-over for topsides up to 18.000 t
  • Launch for Jacket up to 20.000 t
  • Dead weight capacity : 25.000 t
  • Submersible : 24m

Work Scope:

  • Design and Engineering
  • Ship Design & Marine
  • Project Management/ Assistance
    • Suppliers & Yards Follow-up assistance

Owner:

Swiber

Project:

4200T Derrick Lay Barge Basic and Detail Design

Shipyard:

JJNS (Nantong, China)

Key Project Figures:

  • DP3 Dynamic Positioning System
  • 4.200 Mt Crane
  • 240 Mt Pipelaying tensioning capacity
  • 320 pax Accommodation

Work Scope:

  • Design and Engineering
  • Basic Design
  • Detailed Design
  • Piping Systems Design
  • Electrical Systems Design
  • Stinger Design
  • Crane Integration
  • Mooring System Integration
  • Pipe laying Equipment Integration
  • Project Management/ Assistance
    • Class Approval (BV)
    • Procurement, Follow-up and Assistance
    • Side team assistance
  • Hydrodynamics
    • Hydrostatics & Stability Booklets
    • Sea Keeping Analysis
    • Mooring, Pipe Laying & Lifting Analysis

Owner:

Swiber

Project:

KAIZEN 4000 conversion to DP

Shipyard:

Key Project Figures:

  • 2x 4.5MW Propulsion Thrusters
  • 5x 2.2MW Retractable Thrusters
  • 2x 2.5MW Add. Generators Sets
  • Kongsberg DP3 System
  • Barge Layout segregated for DP2+ / DP3
  • Thruster Wells already built-in
  • Future Gensets location ready in E/Rs
  • Electrical System designed for upgrade